Power Upgrade of Ringhals 3

Power upgrade at Ringhals 3 is carried out in two steps, from the initial 920 MW electricity output. The first step was implemented in 2007, when reactor power was increased to 108%. It resulted in an increase in electricity output by more than 80 MW. The last step includes implementing a new turbine plant, increasing the thermal power to 113%.

Within the project, Solvina is involved in:

  • Process calculations for sizing of pumps and valves in the feed water system.
  • Investigation of the changes required in the control systems.
  • Development and validation of the necessary tests required in the plant at the power increase and accounting for the Swedish Radiation Safety Authority, SSM.
  • Dynamic simulation of plant behavior before the tests are carried out in the real plant, including load steps and in-house operation.
  • Management of test runs from the control room.
  • Analysis and evaluation of tests and reporting the results to authority.
  •